IN THE MATTER OF THE : WEST HANOVER TOWNSHIP
APPLICATION OF : ZONING HEARING BOARD
RICHARD YINGST : DOCKET NO. 2002.07
DECISION GRANTING SPECIAL EXCEPTION
TO
PERMIT CONSTRUCTION OF PUBLIC
FACILITIES AND IMPROVEMENTS
WITHIN FLOODPLAIN AND GRANTING
VARIANCES FROM REQUIREMENTS
OF CERTAIN ENVIRONMENTAL PROTECTION
OVERLAY DISTRICTS
Applicant
has requested a special exception to permit construction of public facilities
within a floodplain and also has requested variances from certain of the
environmental protection overlay districts of the West Hanover Township Zoning
Ordinance.
FINDINGS
OF FACT
1. The Applicant/Owner is Richard Yingst
of 7100 Fishing Creek Valley Road, Harrisburg, Pennsylvania 17112.
2. Applicant is the equitable owner under
an Agreement of Sale of an 83 acre property located south of Rabbit Lane and
east of Fairville Avenue.
3. The tax parcel number for the subject
property is 68-020-002.
4. The property is located within the
Flexible Rural Agriculture (FRA) zoning district and partly within the Rural
Residential (RR) zoning district.
5. The property is traversed by a stream
known as Walnut Run and the stream is the boundary line between the RR zoning
district to the north and the FRA zoning district to the south.
6. Approximately 40 of the 83 acres are
located south of Walnut Run and a street and bridge over Walnut Run is
necessary in order to gain access to that area.
7. By a prior Decision of the Zoning
Hearing Board docketed to number 2002.03, Applicant was granted a special
exception to place a private driveway and culvert/bridge over Walnut Run.
8. After issuance of that Decision,
neighboring property owners were concerned about the number of homes to be
built along Rabbit Lane, therefore, Applicant prepared a revised plan to
attempt to reduce the number of homes along Rabbit Lane to five.
9. Applicant intended to place only four
homes south of Walnut Run, but because the Township wanted a public road
instead of a private road, Applicant proposed six lots south of Walnut Run to
be served by the road and bridge to be constructed.
10. Applicant’s Exhibit No. 1 showing the
design of the new layout was admitted into evidence.
11. Although the Federal Regulations permit
no more than a one foot increase in the flood height, the hydraulic
calculations made by Applicant’s representatives show a maximum flood elevation
increase of .75 feet.
12. Admitted into evidence as Applicant’s
Exhibit No. 2 was a plan depicting a .75 feet increase in the flood height.
13. Applicant’s representative testified that
the opening of the culvert or bridge would be at least four times greater than
the double pipes in Walnut Run at North Fairville Avenue, approximately 1,400
feet from the subject proposed crossing.
14. Applicant’s representative stated that
the calculated increase in the flood height at the bridge itself is .78 feet,
and that the increase is less farther away from the bridge.
15. Applicant’s representative stated that in
order to have zero increase in the flood height, a clear span of approximately
150 feet would be required.
16. Construction of the bridge and street
over Walnut Run would constitute construction of public facilities within the
floodplain, which, is a permitted use if a special exception is granted by the
Zoning Hearing Board.
17. The basis for the satisfaction of all
requisite criteria for the special exception are contained in the decision of
the Zoning Hearing Board in the prior case docketed to 2002.03, which is
incorporated herein by reference thereto.
18. Although the provisions for the special
exception state that zero increase in the flood height is permitted, Section 195-76.B.(1)
provide that no variance for an increase in the flood heights for greater than
one foot can be granted.
19. The proposed increase in the flood height
would be no more than .78 feet according to Applicant’s representative.
20. The location of the proposed bridge and
street also impact upon several other environmental overlay protection
districts, specifically the Stream Protection Overlay District (SPOD); the
Hillside and Slope Protection Overlay District (HSPOD); and the Wetland Protection
Overlay District (WPOD).
21. Because construction of the bridge and
street and other public facilities above ground are not specifically stated as
permitted uses in the zoning ordinance section regulating the permitted uses in
the SPOD, HSPOD and WPOD areas, Applicant is requesting a variance from them to
permit construction of the bridge, road and related public facilities.
22. The open space depicted on Applicant’s
Exhibit No. 1 shows 32 acres of open space and 14 ˝ acres of open space
easement, which combined total the requisite 60 percent or 46 acres.
23. The reason Applicant proposed using an
open space easement as opposed to deeded open space is to improve the
saleability of the lots south of Walnut Run which will make the area of the
lots larger thereby generating additional tax revenue for the Township and
other taxing entities.
24. Applicant specifically agreed with the
suggested conditions that if the special exception and variances from the
several environmental overlay protection districts and open space requirements
were granted that it would agree with the following conditions:
(a) if there is any increase in the flood
height on adjacent property owned by others outside the WPOD, Applicant shall obtain
an occasional flowage easement from the owner of said property;
(b) increases in flood heights must be less
than 9.5 inches (0.79 feet) on Applicant’s property and less than 1.5 inches
(0.125 feet) on any other property;
(c) on behalf of the Township, the developer
or Applicant must prepare, submit, and conduct all coordination for any
revisions to the FEMA floodplain mapping that may be required;
(d) the final design of the bridge must be
approved by the Township;
(e) the right-of-way for the construction
width through the floodplain, and the several environmental protection overlay
districts shall not exceed 70 feet;
(f) there shall be no further subdivision
of the subject property or any part thereof; and
(g) the uses permitted in the open space
conservation areas and the open space easements shall be limited to those
permitted uses specified in section 195-87.A. of the Zoning Ordinance.
1. Residents of the vicinity appeared at
the hearing and testified that the revised plan was more acceptable than the
prior plan which was the subject of the Decision entered to Docket No. 2002.03.
2. Notice of the public hearing held on
March 14, 2002 was properly advertised, notice was posted at the municipal
building, the subject property was properly posted and all adjoining property
owners were notified by certified mail.
3.
CONCLUSIONS
1. Section 195-72.B.(2)(b) permits
construction of public facilities and improvements such as streets, bridges and
other similar or related uses within the floodplain.
2. The improvements proposed by the
Applicant are permitted by special exception by the foregoing section of the
West Hanover Township Zoning Ordinance.
3. The Decision of the Zoning Hearing
Board in Docket No. 2002.03 is incorporated herein by reference thereto with
regard to the justification and satisfaction of all of the standards and
criteria necessary for the special exception for the proposed bridge and street
through the floodplain area.
4. Applicant needs a variance from certain
provisions of the Zoning Ordinance in order to complete the project which
includes construction activities within the SPOD, HSPOD and WPOD.
5. Specifically, Section 195-79.(C) of the
Zoning Ordinance does not permit the proposed uses within the SPOD; Section
195-80.(B) does not permit the proposed uses within the HSPOD; and Section
195-82.(C) does not permit the proposed uses within the WPOD.
6. Section 195-199 of the Zoning Ordinance
and Section 910.2 of the Pennsylvania Municipalities Planning Code allow the
Zoning Hearing Board to act on requests for variances and to grant such
requests under certain conditions of hardship and may attach such reasonable
conditions and safeguards as it may deem necessary to implement the purposes of
the Zoning Ordinance.
7. There are unique physical circumstances
or conditions of the subject property, including exceptional topographical and
physical conditions along Walnut Run and the presence of many environmental
protection overlay districts which interfere with the ability to utilize the
property for its permitted use.
8. The unique physical circumstances or
conditions of the subject property have not been created by the Applicant.
9. A variance from the limitations and
uses within the environmental protection overlay districts and from open space
requirements, if approved, would not alter the essential character of the
neighborhood or district in which the property is located nor substantially or
permanently impair the appropriate use or development of adjacent property nor
be detrimental to the public welfare.
10. The variance from the environmental
protection overlay district restrictions and from open space requirements,
subject to the conditions hereinafter set forth as agreed to by Applicant, will
represent the minimum variance that will afford relief and represent the least
modification possible for the regulations in issue.
11. With regard to the requested variances
from the restrictions of the environmental protection overlay districts and
from open space requirements, the quantum of proof required to establish an
unnecessary hardship is less than in a use variance case in accordance with the
holding of Talkish v. Zoning Hearing Board of Harborcreek Township.
12. Approval of the request for a special
exception to permit construction through the floodplain and grant of the
requested variances would be subject to the reasonable conditions specifically
agreed to by Applicant, as stated above under the Findings of Fact.
DECISION
In
view of the foregoing findings and conclusions, and in view of the evidence and
testimony presented to the Zoning Hearing Board, it is the Decision of the
Board that the requested special exception and variances from the limitations
of the environmental protection overlay districts contained in Section
195-79(C), 195-80(B), and 195-82(C) of the Zoning Ordinance and the requested
variance from the open space requirements to permit 14.5 acres to be private open
space easement are hereby GRANTED, subject to the following conditions:
(1) if there is any increase in the flood
height on adjacent property owned by others outside the WPOD, Applicant shall
obtain an occasional flowage easement from the owner of said property;
(2) increases in flood heights must be less
than 9.5 inches (0.79 feet) on Applicant’s property and less than 1.5 inches
(0.125 feet) on any other property;
(3) on behalf of the Township, the developer
or Applicant must prepare, submit, and conduct all coordination for any
revisions to the FEMA floodplain mapping that may be required;
(4) the final design of the bridge must be
approved by the Township;
(5) the right-of-way for the construction
width through the floodplain, and the several environmental protection overlay
districts shall not exceed 70 feet;
(6) there shall be no further subdivision of
the subject property or any part thereof; and
(7) the
uses permitted in the open space conservation areas and the open space
easements shall be limited to those permitted uses specified in section
195-87.A. of the Zoning Ordinance.
DATE: WEST
HANOVER TOWNSHIP ZONING HEARING
BOARD
Brian
F. Jacobeen
Ruth
C. Shields
Norma
J. Gruber
Neil
R. Shatto
ABSTAINED:
Linda L. Turns